1A. Ramp/walk at entry $3 - 4,000  
1B. Ramp/walk at kindergarten 21 - 24,000  
1C. Rails at kindergarten stairs 1.5 - 2,000  
1D. Parking lot access   $128 -144,000
1E. Accessible parking 6,000  
1F. Additional parking   44 - 50,000
1G. Ramp/walk at cafeteria 2.5 - 3,000  
1H. Covered walk by library   18 - 20,000
1I. Replace grates 1,000  

TASK [top] THIS PROJECT FUTURE
2. D.F. $9 - 12,000  
3A. Boys restroom 38 - 48,000  
3B. Girls restroom 54 - 68,000  
3C. Bld G demo. restrooms 3 - 4,000  
4B. Restrooms Bld. G 11 - 14,000  
5A. Bldgs. B, C, D Doors/hardware 30 - 36,000  
5B. Bldgs. B, C, D Cabinets   $ 72 - 84,000
5C. Bldgs. B, C, D Sinks 30 - 36,000  
5D. Bldgs. B, C, D Chalkboards   12,000
5E. Bldgs. B, C, D Windows   1,000 - 1,500
5F. Bldgs. B, C, D Blinds 12 - 18,000  
5G. Bldgs. B, C, D Carpet/VCT 96 - 120,000  
5H. Bldgs. B, C, D Tackwall   36 - 48,000
5I. Bldgs. B, C, D Mech. Unit 180 - 190,000  
5J. Bldgs. B, C, D Electrical 156,000  
5L. Bldgs. B, C, D Paint 6 - 12,000  
5M. Bldgs. B, C, D Extinguisher 5 - 6,000  

TASK [top] THIS PROJECT FUTURE
6A. Bld. E Doors/hardware $ 5 - 6,000  
6B. Bld. E Cabinets   $ 28 - 30,000
6C. Bld. E Sinks 5 - 6,000  
6E. Bld. E Windows   1,000
6F. Bld. E Blinds 5 - 6,000  
6G. Bld. E Carpet/VCT 20 - 22,000  
6H. Bld. E Tackwall   5,000
6I. Bld. E Mech. Unit 30,000  
6J. Bld. E Electrical 26,000  
6K. Bld. E Restrooms 48 - 50,000  
6L. Bld. E Extinguisher 1,000  
6M. Bld. E Paint 2,000  

TASK [top] THIS PROJECT FUTURE
7A. Bld. G sm. Rm. Doors/hardware $ 10 - 12,000  
7B. Bld. G sm. Rm. Cabinets   $ 24 - 28,000
7C. Bld. G sm. Rm. Sinks 10 - 12,000  
7D. Bld. G sm. Rm. Chalkboards   4,000
7E. Bld. G sm. Rm. Windows   1,000
7F. Bld. G sm. Rm. Blinds 4 - 6,000  
7G. Bld. G sm. Rm. Carpet/VCT 30 - 36,000  
7H. Bld. G sm. Rm. Tackwall   4,000
7I. Bld. G sm. Rm. Mech. Unit 64,000  
7J. Bld. G sm. Rm. Electrical 44 - 48,000  
7L. Bld. G sm. Rm. Sound insulation   28 - 32,000
7M. Bld. G sm. Rm. Door hardware 500 - 1,000  
7N. Bld. G sm. Rm. Paint 1,500  
7O. Bld. G sm. Rm. Extinguisher 2.5 - 3,000  

TASK [top] THIS PROJECT FUTURE
8A. Bld. G lg. Rm. Doors/hardware $ 5 - 6,000  
8B. Bld. G lg. Rm. Cabinets   $12 - 14,000
8C. Bld. G lg. Rm. Sinks 5 - 6,000  
8D. Bld. G lg. Rm. Chalkboards   2,000
8E. Bld. G lg. Rm. Windows   500
8F. Bld. G lg. Rm. Blinds 1 - 2,000  
8G. Bld. G lg. Rm. Carpet/VCT 18 - 20,000  
8H. Bld. G lg. Rm. Tackwall   2,000
8I. Bld. G lg. Rm. Mech Unit 32,000  
8J. Bld. G lg. Rm. Electrical 26 - 28,000  
8L. Bld. G lg. Rm. Sound insulation   12 - 14,000
8M. Bld. G lg. Rm. Door hardware 500  
8N. Bld. G lg. Rm. Paint 1,000  
8O. Bld. G lg. Rm. Extinguisher 1,000  

TASK [top] THIS PROJECT FUTURE
10A. Mech Unit   $ 55,000
10B. Exit/Emergency Lighting $ 5 - 7,000  
10C. Doors/hardware 13 - 14,000  
10D. Cabinets   7 - 8,000
TASK [top] THIS PROJECT FUTURE
11A. BASRP Reconfigure storage rm. $ 3 - 4,000  
11B. BASRP Doors/hardware 7 - 8,000  
11C. BASRP Door 1,000  
11D. BASRP Cabinets   $ 3 - 3,500
11E. BASRP Sink 2.5 - 3,000  
11F. BASRP Chalkboard   500 - 1,000
11G. BASRP Carpet/VCT 10 - 11,000  
11H. BASRP Windows   500
11I. BASRP Blinds 1,000 - 1,500  
11J. BASRP Tackwall   1,500 - 2,000
11K. BASRP Mech. Unit 15,000  
11L. BASRP Electrical 16 - 17,000  
11M. BASRP Paint 500  
11N. BASRP Extinguisher 500  

TASK [top] THIS PROJECT FUTURE
12A. Reconfigure Bldg. 145 - 182,000  
12B. Leak 5,000  
13A. Paint Exteriors 26 - 30,000  
13B. Roof Bld. E 40 - 52,000  
13C. Roof Bld. G 87 - 114,000  
13D. Backpack hooks   $ 12.5 - 14,000
14. Dryrot Repair 10,000  
15A. Remove Boiler 5,000  
15B. Water piping 25 - 27, 000  
15C. Waste piping 20 - 22,000  
16A. Electrical service 85 - 88, 000  
16B. Branch circuits 136 - 140,000  
16C. Exterior lighting 25 - 28,000  

TASK [top] THIS PROJECT FUTURE
17A. Fire alarm 14 - 15,000  
17B. Conduit 102 - 106,000  
17C, Telephone 40 - 43,000  
17D. Program clock 22 - 25,000  
17E. Data system 42 - 46,000  

TOTAL THIS PROJECT FUTURE

 

$ 1,967,000 - 2,212,000 $ 551,000 - 627,000


Base Bid: $ 1,627,000 - 1,808,000
Alternates: [top]
1. Blinds $ 18 - 28,000
2. Interior Paint 9 - 15,000
3. Carpet/VCT 154 - 187,000
4. Exterior Paint 26 - 30,000
5. Kindergarten 133 - 144,000
Total Alternates:
  $ 340,000 - 404,000
Available:  
  $ 1,886,000