Pacific Grove Unified School District
Measure A
Pacific Grove High School Proposed Construction Budget

9/14/2000

  5/31/2000 6/2/2000

Note

8/30/2000 9/14/2000
Original Budget Revision #1 Revision #2 Revision #3
Site Improvements:

 

Mechanical/Plumbing

Sub-total

479,906 407,920   407,920 357,920
  Sanitary Sewer          
Storm Drainage System          
Gas Distribution          
Water Distribution          
Fire Hydrants       30,000 30,000

Electrical

Sub-total

1,011,045 817,070 817,070 817,070
  Power Distribution 436,800 436,800   436,800 436,800
Tele Communications 158,970 158,970   158,970 158,970
Fire Alarm Site 163,800 163,800   163,800 163,800
Security System 73,080 25,000   25,000 25,000
Site Lighting 97,755 30,000   30,000 30,000
Parking Lighting 80,800 2,500   2,500 2,500

Network

Sub-total

92,500 92,500   92,500 92,500
  Underground Site 58,750 58,750   58,750 58,750
Cabling/Termination 33,750 33,750   33,750 33,750

Site Work

Sub-total

446,125 364,000   564,000 524,000
  Retaining wall repair 10,000 0   0 0
Handrails/Guardrails 7,500 7,500 A 7,500 7,500
Stair Modifications 2,500 2,500 A 2,500 2,500
New Stairs 40,000 40,000 A 40,000 40,000
New Ramps 200,000 200,000 A 275,000 275,000
Pavement (Fire Lane) 75,000 75,000 A 75,000 75,000
Fill 12,000 0   0 0
Elevator 35,000 35,000 A 160,000 145,000
Landscaping 25,000 0   0 0
Lockers (650) 43,875 1,500 A 1,500 1,500
Signage 2,500 2,500 A 2,500 2,500

Total Sitework:   2,029,576 1,681,490   1,911,490 1,821,490

Building Improvements

 

Plumbing   748,997 550,000   550,000 550,000
Heating/Ventilating   1,199,512 1,000,000   1,000,000 925,000
Electrical $591,090x1.25   738,862 628,032    628,032 578,032
Network Cabling $40,000x1.25   50,000 50,000   50,000 50,000
Architectural   2,761,378 1,032,371   1,482,371 834,883
Exterior Roofing 501,188     500,000 25,000
  Painting 163,942 30,000   30,000 30,000
Windows 307,403 50,000   50,000 20,000
Dryrot 35,000 35,000   35,000 35,000
Doors/Hardware 127,000 120,000   120,000 120,000
Signage 9,792 9,200   9,200 9,200
Miscellaneous 1,500 1,500   1,500 1,500
Interior  
  Flooring 169,721 144,720   144,720 44,720
Painting 168,845 25,000   25,000 25,000
Window Coverings 60,750 0   0 0
Casework 34,900 34,900 A 34,900 34,900
Equipment 88,725 87,231   87,231 37,231
Doors/Hardware 64,520 64,520 A 64,520 64,520
Construction/Demolition 182,800 82,800   82,800 164,012
Toilet Rooms 121,800 100,000 A 100,000 100,000
Patching 43,000 33,000   33,000 33,000
Wheelchair Lift 15,000 15,000 A 15,000 15,000
Acoustic Panels 25,000 0   0 0
Lockers (Gym) 59,480 0   0 0
Bleachers (Gym) 130,908 0   0 0
Home Economics 45,000 45,000   45,000 45,000
Theater Improvements 35,000 35,000   35,000 0
Fume Hoods 18,000 18,000 A 18,000 18,000
Waterproofing 6,500 6,500   6,500 6,500
Miscellaneous 67,481 45,000   45,000 0
District Office 205,600 0   0 0
Total Bldg. Improvements   5,498,749 3,260,403   3,710,403 2,937,915

Other Improvements
  Asbestos Abatement 316,215 158,107   193,107 25,000
Network Enhancement 123,750        
T.V./Media $75,000          
101QO system $48,750          
Performing Arts Facility 1,340,000        
Bldg. $1,200,000          
Sitework $130,000          
Gymnasium Lobby 150,000        
Phased Construction       320,000 250,000
Building I       245,595 145,595

Total Other Improvements   1,929,965 158,107   758,702 429,595

  5/31/2000 6/2/2000

Note

8/30/2000 9/14/2000
Original Budget Revision #1 Revision #2 Revision #3

TOTAL IMPROVEMENTS   9,458,290 5,100,000   6,380,595 5,180,000
Over Budget   4,358,290 0   1,280,595 80,000
Additional OPSC Elevator Funding         -80,000 -80,000
Over Budget         1,200,595 0

Budget Revision No. 3 - 9/14/00 Notes:
A. Based upon deferred funding and construction of following improvements by District.
1. Roof Replacement 500,000
2. Roof Asbestos Abatement 158,000
3. Floor Replacement 100,000
4. Floor Asbestos Abatement 158,000
5. Theater 35,000
6. Lockers 50,000
7. Landscape/Irrigation 50,000
8. Inflation @ 4% per year 100,000

TOTAL

$ 1,151,000

Budget

$ 1,200,000
B. Improvements would be phased over a five-year period.
C. Digital High School monies not shown in budget.


Pacific Grove USD
Monterey County Office of Education

email: webmaster@pgusd.org

updated: 10/16/2000