Pacific Grove Unified School District
Measure D - Project Pictures
District Contact: Robin Blakley, Assistant Superintendent, Business [831-646-6509]
|
STADIUM OPEN TO THE PUBLIC* *Unless:
|
|
We will show pictures here as the construction work progresses.
Newest Pictures at the top; older and "Before" pictures at the bottom. ---> Aerial Photographs of Stadium Project Site (external link) |
| Richard Chamberlin Memorial | |
![]() |
![]() |
| Larger Versions available for Download: | |
9x12" (2.1 Mb) |
9x12" (2.1 Mb) |
| Aerial Panorama Stadium (May 2009; permission by Aircam Photography) |
![]() |
| Aerial Photographs of Stadium with Track Lines (May 2009; permission by DMC) |
![]() |
![]() |
| Photos also available in larger sizes. (Click photo below to open in browser, or Right-Click [Mac Ctrl-Click] to Save Image to your Computer |
|
|
| Track Preparation | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| Stadium Field Prep and Bleacher Installation | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| Aerial View and Installing Light Standards of Stadium Aerial views courtesy of Dan McAweeney |
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| Installing PG Logo and Breakers Name | |
![]() |
![]() |
![]() |
![]() |
| Installing Numbers and PG Logo | |
![]() |
![]() |
![]() |
![]() |
| General Work on the Staduim Project | |
Installing Artificial Turf![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| General Work on the Staduim Project | |
Track and Field Grading![]() |
Field House framing![]() |
| General Work on the Staduim Project | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| These depict the demolition of the home bleachers and placement of the underground utilities. | |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| These are photos of the PGHS Stadium demolition efforts up to June 30, 2008. The field, Score board, light bases and old piping. Also the bleacher demo is pictured. |
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| "BEFORE" (June 2008)
|
"BEFORE" (June 2008)
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|
measured/stadium/index.html