Pacific Grove Unified School District
Measure D - Project Pictures

District Contact: Robin Blakley, Assistant Superintendent, Business [831-646-6509]

Pacific Grove High School: Breakers Stadium Project

STADIUM OPEN TO THE PUBLIC*
7AM – Sunset

*Unless:

1. In use by the High School ( or other PG School) for classes or activities not compatible with open public use - as determined by the responsible school employee, or
2. Reserved for a District approved activity not compatible with open public use.
If this open access results in facility abuse or damage it will need to be restricted.
Please report any abuse or damage to the District at 646-6517 or the Pacific Grove Police Dept.
648-3143
In Case of Emergency call 911

We will show pictures here as the construction work progresses.
 Newest Pictures at the top; older and "Before" pictures at the bottom.
---> Aerial Photographs of Stadium Project Site (external link)
Richard Chamberlin Memorial
Larger Versions available for Download:
9x12" (2.1 Mb) 9x12" (2.1 Mb)
 
Aerial Panorama Stadium (May 2009; permission by Aircam Photography)

Aerial Photographs of Stadium with Track Lines (May 2009; permission by DMC)
Photos also available in larger sizes.
(Click photo below to open in browser, or Right-Click [Mac Ctrl-Click] to Save Image to your Computer

Full Size (29 x 12") 1.1Mb

Medium Size (10 x 4") 332Kb

Full Size (28 x 29") 3.2Mb

Medium Size (8 x 9") 532Kb

Track Preparation
 

Stadium Field Prep and Bleacher Installation
 
Aerial View and Installing Light Standards of Stadium
Aerial views courtesy of Dan McAweeney
 
Installing PG Logo and Breakers Name
Installing Numbers and PG Logo

General Work on the Staduim Project
Installing Artificial Turf

General Work on the Staduim Project
Track and Field Grading
Field House framing
General Work on the Staduim Project
These depict the demolition of the home bleachers and placement of the underground utilities.
These are photos of the PGHS Stadium demolition efforts up to June 30, 2008.
The field, Score board, light bases and old piping. Also the bleacher demo is pictured.
   
"BEFORE" (June 2008)

"BEFORE" (June 2008)

 


District Office: (831) 646-6510
updated:10/2/09

measured/stadium/index.html